The short answer
Under the heater the floor must be rock: tile on cement board, with dark grout, over the area inside the guard and a few inches around it (Harvia's KIP manual). The 6 x 7 ft outdoor plan tiles 29-3/4 in x 19-5/8 in, 4.1 sq ft, and covers the rest of the floor in waterproof sheet vinyl with optional removable cedar duckboards on top. An indoor room on a concrete slab uses the slab. The planner draws no floor drain.
Three pages on this site sound alike, so here is the split. The foundation guide is what the sauna sits on. The sauna floor plans are the layout of the room seen from above. This guide is the surface you stand on inside it: what it is made of, what goes under the heater, and what we do not draw.
Short version: the floor is a different job under the heater than everywhere else. The heater's manual sets the first, and you choose the second. The numbers below come from the same engine as the free plans.
What the floor is made of
| Where | What the planner draws | Why |
|---|---|---|
| Under and near the heater | Tile on cement backer board, dark grout | Harvia's KIP manual asks for floor coverings made of rock materials below and near the heater |
| Indoor room, rest of the floor | The existing concrete or tile slab | A slab is already rock; nothing to add |
| Outdoor cabin, rest of the floor | Plywood on joists, covered with waterproof sheet vinyl | Keeps splash water out of the plywood |
| On top, outdoor or indoor | Removable cedar duckboards (optional) | Warm, dry footing you can lift out to dry |
Harvia KIP manual Y05-1516 B (08/26), p. 16. The wording is "dark joint grouts and floor coverings made of rock materials below and near the heater". Other heaters have their own manual: read yours.
Indoor: concrete or tile on the slab
An indoor room is framed on the floor you already have. In a basement or garage that is a concrete slab, and for the planner that settles the heater rule: the 5 x 7 ft indoor plan reads "The room stands on the existing concrete or tile slab, so the floor under and near the heater is rock material; no wood, vinyl or carpet goes over it in the heater zone."
That rule is about the heater zone. Beyond it you can leave the slab bare, tile it or lay duckboards, and none of that changes the heater's clearances. What you must not do is lay a wood, vinyl or carpet floor over the slab under the heater and its guard.
Check before you cut
The planner does not check your slab
We do not measure slab level, moisture or a drain, because we cannot see your slab. Level it, and ask your building department what a room of this kind needs. The basement sauna plans and the build guide show the walls going down on it.
Outdoor: the floor frame the planner draws
An outdoor cabin has a real floor, and the planner draws it as part of its "Site and floor" group. For the 6 x 7 ft plan that group is $1,099 at the store prices we read, and it holds the deck blocks, gravel and fabric of the foundation as well as the floor itself.
Frame the floor on the skids.
Joists at the spacing the plan gives, every sheet end centered on a joist, so the plywood is supported at every joint.Glue and screw the plywood.
3/4 in tongue and groove plywood, long side across the joists, glued to the joists and screwed every 6 in at the ends and 12 in in the field.Tile the heater zone first.
Cut a piece of cement board to the 29-3/4 in x 19-5/8 in zone, set it in thinset, screw it every 8 in, then tile it with dark grout.Seal and lay the vinyl.
Two coats of waterproofing membrane over the board, lapped 2 in onto the subfloor. The sheet vinyl laps over that strip and is sealed to it, so water on the floor never reaches the plywood at the joint.Ramp the tile edge.
An aluminum edge reducer takes the step down from tile to vinyl along the open edge of the zone.
The tile zone is the area inside the guard plus the heater's spacing to adjacent surfaces all round, which for this heater is 5 in. That is our reading of "near", not a number from the manual, and the plan says so. The priced parts of the tile job (board, thinset, screws, membrane, grout and sealant) come to $137; the tile and the edge reducer are allowances you price at your own store.
The vinyl is one cut off a 12 ft roll, 96 sq ft for the 6 x 7 ft floor, turned up 4 in at every wall behind the bottom board: $113 at Home Depot, Hamilton Mill on 2026-10-13. The plan notes that tile on cement board works for the whole floor too.
Duckboards
Duckboards are removable slats you lay over the open floor outside the heater zone. They are optional in every plan, so the total does not include them. For the 6 x 7 ft cabin the planner lists 4 cedar panels of 2 x 2 ft: $520, from Haven of Heat on 2026-10-09. You can also make them from the same cedar as the benches. Lift them out after a session so floor and boards dry.
Drain or no drain
The planner does not draw a floor drain, a sloped floor or a wet-room floor. The outdoor floor is a dry-use floor with a waterproof covering, and the indoor floor is whatever slab you have. If you want a drain in a slab, that is a plumbing and masonry job for a licensed trade and your building department, and we have nothing to price it from.
If you plan a shower next to the sauna, the sauna with shower guide covers what the planner does and does not do there.
Insulating the outdoor floor
In cold climates the planner offers it as an option, not as a default: mineral wool between the floor joists, held from below by a vapor-open board that also keeps animals out. For the 6 x 7 ft plan that is 2 bags of R15 wool ($172) and 3 sheets of asphalt-impregnated board ($54), left out of the total until you add them. We give no R-value target for the floor, because we have no source for one.