Skip to content
Design free
A small backyard sauna cabin at sunset, warm light in its narrow side window and through its glass door
Illustration

Free sauna designer $59 builder's plan

Sized to your room. Heated to match.

Set the inside size, indoors or out. The planner puts the benches where the heat is, sizes the heater to the room, keeps its clearances and prices every board, free. Benches, heater and every board follow it, free.

In the planner

A sauna like this one, 3 seats

Inside the 6x7 outdoor sauna: the benches, the heater and its guard, drawn by the designer
Room to heat
305 cu ft
294 of air + 11 for 2.7 sq ft of glass
Heater
8 kW
rated 250 to 425 cu ft
Load
33.3 A
at 240 V; your electrician sizes the circuit
Top bench
46 in
below the ceiling
The 6x7 outdoor sauna plan

How the planner thinks

From the room to the circuit, one number at a time.

Change the room and every line below follows it. This is the 6x7 outdoor sauna, as the designer works it out.

The 6x7 outdoor sauna with its outside dimensions, drawn by the designer
  1. The room

    6 x 7 ft, 7 ft ceiling

    294 cu ft of air. Glass loses heat faster than an insulated wall, so Harvia counts each square meter of glass as 1.2 cubic meters of room: the 2.7 sq ft window adds 11 cu ft, for 305 cu ft to heat.

  2. The heater

    Harvia 8 kW

    Rated for 250 to 425 cu ft by its maker. The planner takes the next size up once a room passes 90 percent of a heater's range.

  3. The clearances

    5 in to the wall, guard 2 in off

    From the heater's US manual: the benches, the door and the window sit outside these distances, and the top bench lands 46 in under the ceiling, inside the 43 to 51 in HUUM asks for.

  4. The circuit

    41.7 A conductors

    33.3 A at 240 V. The planner sizes the conductors at 125 percent, treating the heater as a continuous load (NEC 424.4(B), 75 °C terminations assumed). The heater's manual and the code your town adopted govern; a licensed electrician designs, sizes and connects the circuit.

  5. The air

    6 in in, 12 in out

    Supply low beside the heater, exhaust low on the far wall, a 4 in drying vent up high. Laid out to the heater maker's rules; natural draft is not calculated.

Start from the people

How many people?

Seats are counted on the top bench at about 24 in a person (Harvia). These are the starting plans that seat that many; the designer takes any inside size from 4 to 12 ft wide and 4 to 12 ft deep.

5 starting plans seat 3

Compare all the sauna plans

Where it goes, how it heats

Backyard cabin, basement room or wood fire.

  • A backyard sauna cabin on deck blocks with a dark metal roof and one narrow windowIllustration

    6 plans$8,386 to $12,812

    Outdoor sauna plans

    A cabin on deck blocks with its own floor, a gable metal roof, insulated walls and an electric heater fed from the house. 2 to 5 people.

  • An indoor sauna behind a glass door in a finished room, two lit cedar bench tiers and an electric heater insideIllustration

    5 plans$4,399 to $5,652

    Indoor sauna plans

    A room framed inside a basement, a garage bay or a large bathroom, on the floor you have, with a heater on its own 240 V circuit. 2 to 3 people.

  • A wood-fired backyard sauna cabin in snow, its steel chimney smoking and firewood stacked beside itIllustration

    1 plan$13,176

    Wood-fired sauna plans

    No heater circuit: the stove package with its chimney kit and the clearances to everything that burns. Outdoors only.

Photos are illustrations of saunas like these, not the plans as drawn.

What it costs

$8,751 for the 6x7 outdoor sauna, heater included.

Included: every one of its 115 material lines at a store price, the Harvia 8 kW heater among them. Kept apart: the electrician, hired labor, tax, delivery, permits and tools.

Materials, heater included
$8,751
Per seat
$2,917
Electrician, apart
$400 to $1,100
Labor if hired
$1,500 to $2,500

Excluded: tax, delivery, permits and tools.

Price your own size in the sauna cost calculator, or check a heater against your room in the heater size calculator.

Materials by part of the build

  • Shell$3,466Floor, frame and roof
  • Lining$2,323Insulation and lining
  • Heat$1,519Heater and vents
  • Fit-out$1,144Benches, door and windows
  • Light$298Light

The $59 builder's plan

Read the plan before you design a thing.

These are sheets from the 53-sheet plan for the 6x7 outdoor sauna. Yours is drawn from the sauna you design, for one payment of $59. Designing, checking and pricing it is free.

Free

  • The sauna in 3D, and every change you make to it
  • Every planner check, with its rule and its source
  • The heater sized and the materials list priced line by line
  • A free summary PDF on every starting plan

$59 once

  • Every wall framed stud by stud, with the bench blocking and vent openings
  • Benches, heater, guard and vents placed and dimensioned
  • The electrician sheet: load, conductors at 125 percent and breaker
  • The priced materials list and cutting maps for every board
  • The build in order, each step drawn with a check before you go on
Design my sauna, then get the plan

In Canada the plan is CA$79. You check out in the designer, with your design loaded. If the plan has an error, we fix it or refund you within 30 days. Guarantee terms.

Real sheets from the 53-sheet sample plan for the 6x7 outdoor sauna

  • Sample sheet 7 of 53 from the sauna plan: plan and section

    07Plan and section

  • Sample sheet 30 of 53 from the sauna plan: wall framing

    30Wall framing

  • Sample sheet 11 of 53 from the sauna plan: materials

    11Materials

  • Sample sheet 25 of 53 from the sauna plan: cutting maps

    25Cutting maps

  • Sample sheet 43 of 53 from the sauna plan: build sequence

    43Build sequence

100%
Sauna plans sample sheet

The build

First footing to first heat, about 80 hours.

The 6x7 outdoor sauna in 8 phases, for two people new to framing. Each picture is the design at the end of its phase, drawn by the designer. The electrician's work is hired and not counted.

  1. The 6x7 outdoor sauna after phase 1: site, footings and floor

    01about 11 h

    Site, footings and floor

  2. The 6x7 outdoor sauna after phase 2: wall framing

    02about 7 h

    Wall framing

  3. The 6x7 outdoor sauna after phase 3: ceiling joists, rafters and roof

    03about 14 h

    Ceiling joists, rafters and roof

  4. The 6x7 outdoor sauna after phase 4: wrap, siding and trim

    04about 9 h

    Wrap, siding and trim

  5. The 6x7 outdoor sauna after phase 5: rough-in, insulation and foil

    05about 9 h

    Rough-in, insulation and foil

  6. The 6x7 outdoor sauna after phase 6: ceiling and wall boards

    06about 10 h

    Ceiling and wall boards

  7. The 6x7 outdoor sauna after phase 7: benches, door and window

    07about 15 h

    Benches, door and window

    The room becomes a sauna

  8. The 6x7 outdoor sauna after phase 8: heater, guard, vents and light

    08about 5 h

    Heater, guard, vents and light

    First heat

Every phase with its materialsHow to build a sauna, step by step

Questions

Anything else? Write to us or read the sauna guides.

Before you start

One PDF on Letter paper for the sauna you designed: 53 sheets for the 6x7 outdoor sauna sample. The checks with their sources, the plan and section, the heater, power and air sheet, every wall stud by stud, the materials list with the store and date on each line, cutting maps for every board and the build in order. In Canada it is CA$79.

Yes. The sizing, the benches, the heater pick, the checks, the 3D views and the priced materials list are free on screen, with no account. You pay only for the builder's plan of your design.

For a small room a kit is cheaper up front; building gets you the size and the heater you want. The 6x7 outdoor sauna on this page comes to $8,751 in materials and heater at the store prices we read, with the electrician apart ($400 to $1,100, HomeGuide) and labor if hired at $1,500 to $2,500.

Work out the room volume, add load for glass, and pick a heater whose maker-rated range covers it. The 6x7 outdoor sauna is 294 cu ft, 305 with its window: a Harvia 8 kW, rated 250 to 425 cu ft. The heater size calculator does it for any room.

For an electric heater, yes: heaters this size run on 240 V, often called 220. The 8 kW heater here draws 33.3 A, so its conductors are sized for at least 41.7 A (125 percent, NEC 424.4(B)), installed by a licensed electrician. A wood stove needs no heater circuit.

Often, and it depends on your town. A new 240 V circuit usually needs an electrical permit, and many towns want a building permit for an accessory building over a size limit or with a wood stove. The planner does not check local rules: ask your building department before you buy lumber.

A small outdoor sauna cabin at night at the end of a lawn, its glass door glowing and faint steam in the cold airIllustration

Your room, your heater

There's room for a sauna. Let's find it.

Start from a plan or a blank size. Change the benches, the heater, the door and the windows; the checks and the price follow every change.

Designing
Free
Builder's plan
$59 once
Account
Not needed